constructionof the Paremata (Wellington) traffic bridge is now well under way. On left, excavating for the abutments the reinforcing of the concrete piles which will be used in the construction of the bridge.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MT19351002.2.73
Bibliographic details
Manawatu Times, Volume 60, Issue 232, 2 October 1935, Page 9
Word Count
33constructionof the Paremata (Wellington) traffic bridge is now well under way. On left, excavating for the abutments the reinforcing of the concrete piles which will be used in the construction of the bridge. Manawatu Times, Volume 60, Issue 232, 2 October 1935, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.