THE NEW BRIDGE Sucli an imposing structuro lias been designed and built to enduro-tho overincreasing load of traffic. Its massive steel rollers, couplings, hinges, suspension rods, etc., and the -welding, are vitally important. To bo certain that' this work would bo faithfully done, it was entrusted to TAYLOR & POINTON, LIMITED. S 3 EANGITIKEI ST. PHONE DO Go.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MT19350729.2.119.5
Bibliographic details
Manawatu Times, Volume 60, Issue 176, 29 July 1935, Page 12
Word Count
57Page 12 Advertisements Column 5 Manawatu Times, Volume 60, Issue 176, 29 July 1935, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.