Building Recovery in Sydney
water BOARD’S FIGURES United Press Association —By Electric Telegraph—Copyright. SYDNEY, June 21. Evidence of a building recovery is provided by the Metropolitan Water Board’s returns for May. In tho board’s area, which includes a portion of the South Coast, 234 buildings were erected or altered at a cost of £220,375, compared with 141 and £50,699 in May of last year. The board’s statistics reflect renewed activity in suburban home building.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MT19330623.2.102
Bibliographic details
Manawatu Times, Volume LIV, Issue 7190, 23 June 1933, Page 9
Word Count
74Building Recovery in Sydney Manawatu Times, Volume LIV, Issue 7190, 23 June 1933, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.