UNEMPLOYED RELIEF
WORKS IN PROGRESS. It was reported to the Palmerston North City Council Inst evening by the
engineer (Mr .7. R. Hughes) that the following works were in progress under the No. 5 scheme:—(a) Road widening in Vogel Street; (b) lowering crown of road and re-grading Main Street, south side of the railway line, between Albert Street and Victoria Avenue; (c) lower-
ing crown of road and re-grading North Street; (d) cleaning up streets and lawns in Union, Marne, Ada, Ranfurly, Rolleston and Ashley Streets; (e) formation of footpath (Clelland Street). The following works had been completed:—Kawau branch drain deviation, section 178; formation of new street
through reserves, from Kifzherhcrt Avenue to Jickell Street; enlarging culvert, Rongopai Street. at Kawau branch drain; levelling and grading at Takaro Park; kerb and channelling Albert Street; erection of additions to kitchen (camping ground).
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MS19321220.2.51
Bibliographic details
Manawatu Standard, Volume LIII, Issue 20, 20 December 1932, Page 4
Word Count
141UNEMPLOYED RELIEF Manawatu Standard, Volume LIII, Issue 20, 20 December 1932, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Standard. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.