ANOTHER BIG WORK AT ARAPUNI.—The great hole gouged out by the water plunging through the narrow exit down to the buried forest has been partly filled in. Eventually it will be coated with concrete and the cliffs around it reipforced.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MS19310411.2.32.4
Bibliographic details
Manawatu Standard, Volume LI, Issue 111, 11 April 1931, Page 4
Word Count
40ANOTHER BIG WORK AT ARAPUNI.—The great hole gouged out by the water plunging through the narrow exit down to the buried forest has been partly filled in. Eventually it will be coated with concrete and the cliffs around it reipforced. Manawatu Standard, Volume LI, Issue 111, 11 April 1931, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Standard. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.