SYDNEY’S AMBITION REALISED. —The latest picture of the Sydney Harbour Bridge, looking from Milson’s Point to the city. Following the great engineering feat of linking up the 1650 ft span, the Seeking of the bridge has been completed in the last few months. The laying of the roadway and railway on the bridge decking is now under way.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MS19310321.2.24
Bibliographic details
Manawatu Standard, Volume LI, Issue 94, 21 March 1931, Page 4
Word Count
58SYDNEY’S AMBITION REALISED.—The latest picture of the Sydney Harbour Bridge, looking from Milson’s Point to the city. Following the great engineering feat of linking up the 1650ft span, the Seeking of the bridge has been completed in the last few months. The laying of the roadway and railway on the bridge decking is now under way. Manawatu Standard, Volume LI, Issue 94, 21 March 1931, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Standard. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.