POWER INTERRUPTION
AT PUBLIC WORKS SUB-STATION. BOROUGH PLANT TAKES UP LOAD. Shortly before 1 p.m. the electrical power supply in tho borough failed as the result of a breakdown in the Public Works Department’s sub-station at Bunnythorpe. Two of the engines at the borough powerhouse, however, were quickly got into operation and within a space of about 15 minutes the service was restored from the Terrace End plant. The defect at the Government, sub-sta-tion look over an hour to remedy and it was nearly' 2.30 p.m. before the Mangahao supply was restored.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MS19250818.2.81
Bibliographic details
Manawatu Standard, Volume XLV, Issue 217, 18 August 1925, Page 8
Word Count
92POWER INTERRUPTION Manawatu Standard, Volume XLV, Issue 217, 18 August 1925, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Manawatu Standard. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.