MINING.
Tus following report of the Mount Lyell Mining and Railway Company for the week ending Nov. 17, has been received from Dunedin from our special correspondent:—Smelting plant Five furnaces in operation, excavation for foundation of sixth furnace. started and well in hand, erection of u atte storage shed on slag dump in progress. New smelting plant —Beginning made with excavations for same, starting on railway siding to level of slag dump. New laboratory—Foundations for same commenced. Limestone quarry—Four storage bins completed and being filled. No. 4 locomotive assembled and now running, giving every satisfaction. Converter plant—lolo tons of blister copper consigned to date, being 745 tons for the current half-yestr; total production to date, 4170 tons.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/LT18971208.2.55
Bibliographic details
Lyttelton Times, Volume XCVIII, Issue 11446, 8 December 1897, Page 6
Word Count
117MINING. Lyttelton Times, Volume XCVIII, Issue 11446, 8 December 1897, Page 6
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.