Cost of Bulldozing
At the October meeting of the Coromandel County Council a report was received that the cost of the bulldozing of the Hahei-Hot Watei' Beach road was estimated at £l2O. Cr. W. Hamilton stated that the only fence necessary would cost no more than £5O. On the motion of Cr. Winstone, seconded by Cr. A. J. Notman, it was decided to have the road bulldozed. Furey’s Bridge Wall A letter from the Returned Services Association asking to have repairs or work done to the retaining wall at Furey’s bridge was received by the October meeting of the Coromandel County Council. It was resolved to get the consulting engineer to prepare a plan for the proposal.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/HPGAZ19471029.2.46
Bibliographic details
Hauraki Plains Gazette, Volume 56, Issue 32927, 29 October 1947, Page 9
Word Count
117Cost of Bulldozing Hauraki Plains Gazette, Volume 56, Issue 32927, 29 October 1947, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Hauraki Plains Gazette. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.