THE DISABLED NARBUDDA
PATCH COMPLETED. [United Press Association—By CableCopyright.l (Received 4, 11.25 a.m.) Gibraltar, Aug. 3. The steamer Narbudda has been patched and all her pumps are working. An overnight cable stated:—The Nerbudda is aground from the mainmast forward. Nos 1 and 2 holds are practically dry. No. 3 is full of water, Nos. 4 and 5 have elevn feet, and No. 6 nine feet of water in them. The engine-room and stokehold are full. Nos. 3, i and 6 holds are being pumped out. Divers expect to complete the patch by Thursday.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/HBTRIB19300804.2.36
Bibliographic details
Hawke's Bay Tribune, Volume XX, Issue 192, 4 August 1930, Page 5
Word Count
93THE DISABLED NARBUDDA Hawke's Bay Tribune, Volume XX, Issue 192, 4 August 1930, Page 5
Using This Item
NZME is the copyright owner for the Hawke's Bay Tribune. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.