NEW ARAPUNI TUNNEL
SAFETY BY-PASS COMPLETED. (By Telegraph—Press Association.) AUCKLAND, Jan. 7. Work on the by-pass tunnel at Arapuni has been completed. Last week a most successful experimental trial was carried out, wheu a great volume of water was released through the newlylined escape. Tlie Hon. E. A. Ransom stated in an interview this morning that the engineer-! n-oluef of the Public Works Department, Mr F. AV. Furkert, reported a few days ago that the relining of the by-pass tunnel has been successfully effected,. The Minister said the progress made on tlie work at A.rapuni was most gratifying. Tho anxiety experienced a few months ago in consequence of the erosion at tlie spillway had been allayed, lb was hoped that it would never bo necessary to use the by-pass tunnel, but it was reassuring to know that this channel was available in the event of the water pressure becoming too great.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/HAWST19300108.2.52
Bibliographic details
Hawera Star, Volume XLIX, 8 January 1930, Page 6
Word Count
151NEW ARAPUNI TUNNEL Hawera Star, Volume XLIX, 8 January 1930, Page 6
Using This Item
Stuff Ltd is the copyright owner for the Hawera Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.