It is interesting to note that n concrete bridge is cheaper to build than a wooden one (says the Wairarapa Age). Alternative tenders by the same, contractor /for a bridge were recoived’by the Masterton County Council, the price for the timber bridge being £728 10s, and for the concrete one £705 15s.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/HAWST19251023.2.52.2
Bibliographic details
Hawera Star, Volume XLV, 23 October 1925, Page 5
Word Count
52Page 5 Advertisements Column 2 Hawera Star, Volume XLV, 23 October 1925, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Hawera Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.