TARANAKI OILFIELDS.
(BY TELEGRAPH. PRESS ASSOCIATION A NEW PLYMOUTH, Aug. 4,
The Taranaki Oilfields, Ltd., repo fibs : —Tarata well has been drilled to’ 2740 feet in shale, making open hole for 81-inch casing. Aloturoa well is drilled to 1585 feet in shale, boring for 10-ineh casing. Everything is going smoothly.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/HAWST19250804.2.71
Bibliographic details
Hawera Star, Volume XLV, 4 August 1925, Page 9
Word Count
50TARANAKI OILFIELDS. Hawera Star, Volume XLV, 4 August 1925, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Hawera Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.