£30,000,000 SCHEME.
RAILWAY DEVELOPMENT WORKS IN BRITAIN. FIVE YEARS’ PLAN. STATE TO GUARANTEE LOAN. .British Official Wireless.) RUGBY, Nov. G. A big scheme of railway development works, extending over five years and costing some £30,000,000, and’ for which a loan is to be guaranteed as to principal and interest by the Exchequer will be raised, has been agreod upon following prolonged negotiations between the Government and four main lino railway companies. The granting of the necessary powers by Parliament is only awaited before this programme of expansion and reconstruction is put in hand. In addition to the reconstruction and enlarging of many important stations and goods yards, the building of rolling stock and the laying of now branch and loop lines are proposed. The works include the extension of the automatic train control system, the installation of colored light signalling and other safety precautions, and big schemes of electrification. When completed the electrical services from London, which already run to® Brighton and Eastbourne, will exUfeid to Portsmouth, , Arnndol and hustings.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/GIST19351108.2.57
Bibliographic details
Gisborne Times, Volume LXXXIII, Issue 12704, 8 November 1935, Page 8
Word Count
170£30,000,000 SCHEME. Gisborne Times, Volume LXXXIII, Issue 12704, 8 November 1935, Page 8
Using This Item
The Gisborne Herald Company is the copyright owner for the Gisborne Times. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Gisborne Herald Company. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.