DUNLOP FACTORY
CONSTRUCTION SOON (P.A.) WELLINGTON, Nov. 20. After considerablye delay due mainly to the cement shortage, the building of the Dunlop Company’s Upper Ilutt tyre factory is expected to begin soon. ‘ This was revealed yesterday by Mr. P Proctor, managing director of Dunlop (N.Z.). Limited, which is to make rubber goods in the Dominion with the production of tyres concentrated at Upper Hutt
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/GISH19461121.2.113
Bibliographic details
Gisborne Herald, Volume LXXIII, Issue 22184, 21 November 1946, Page 8
Word Count
64DUNLOP FACTORY Gisborne Herald, Volume LXXIII, Issue 22184, 21 November 1946, Page 8
Using This Item
The Gisborne Herald Company is the copyright owner for the Gisborne Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of the Gisborne Herald Company. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.