BUILDING PERMITS
FETLWNG’S -MAY FIGTRE*. Ituilding operations are practically at a standstill in Keilding at the present time, only alterations' and additions to Cost COo and the erection of one dwelling to cost CfiOO. figuring in five permits issued by the Keilding Borough Council lor the month ending Alay Ml. The total value of the permits amount; to C-fiOo, compared with Cl DOT lor lie previous month.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/FS19250601.2.58
Bibliographic details
Feilding Star, Volume 3, Issue 577, 1 June 1925, Page 8
Word Count
67BUILDING PERMITS Feilding Star, Volume 3, Issue 577, 1 June 1925, Page 8
Using This Item
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.