GAME NOT WORTH ZEPPELIN.
It is calculated that the cost of a modern Zeppelin is somewhere in the region of £100,000, and that it demands an expenditure of anything up to £10,000 to send one to England and take it back again. As each vessel requires the constant services of several hundreds of trained men to handle it, as well as a costly engineering staff and factory equipment, the total cost of Germany's Zeppelin bill must run into millions of pounds.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/FS19170120.2.8.9
Bibliographic details
Feilding Star, Volume XIII, Issue 3146, 20 January 1917, Page 2
Word Count
81
GAME NOT WORTH ZEPPELIN.
Feilding Star, Volume XIII, Issue 3146, 20 January 1917, Page 2
Copyright undetermined – untraced rights owner. For advice on reproduction of material from this newspaper, please refer to the Copyright guide.