SINGAPORE NAVAL BASE
COMPLETION IN SEPTEMBER Press Association—By Telegraph—Copyright. LONDON, April 5. In the House of Commons Sir Bolton Eyres-Monsell informed Mr Louis Smith that it was hoped that the Jackson contract for the Singapore naval base would be completed in September and the remaining works four years thereafter. It would be used as a fuelling, storing, and repair base. There was no indication that a squadron would be permanently stationed there. The base was within the limits of the China command.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/ESD19330407.2.77
Bibliographic details
Evening Star, Issue 21381, 7 April 1933, Page 9
Word Count
82SINGAPORE NAVAL BASE Evening Star, Issue 21381, 7 April 1933, Page 9
Using This Item
Allied Press Ltd is the copyright owner for the Evening Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence. This newspaper is not available for commercial use without the consent of Allied Press Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.