UNA HILL GOLD MINE.
Una Hill Consolidated reports from Thames: —During week ended January 10 work continued on specimen reef while a rise has been started to connect with same reef south of shaft. Several tons of high-grade dirt and 141b of picked stone recovered. Crushing will be resumed as soon as School of Mines plant reopens.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19410114.2.89
Bibliographic details
Evening Post, Volume CXXXI, Issue 11, 14 January 1941, Page 9
Word Count
57UNA HILL GOLD MINE. Evening Post, Volume CXXXI, Issue 11, 14 January 1941, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.