MINING RETURNS
(By Telegraph—Press Association.)
DUNEDIN, This Day. The Clutha wash-up was 260z for 126 hours. The Waitahu wash-up was 230z for 32 shifts,of eight.hours each.
The Okarito wash-up was 370z 15dwt for 105 hours.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19380711.2.150
Bibliographic details
Evening Post, Volume CXXVI, Issue 9, 11 July 1938, Page 13
Word Count
35MINING RETURNS Evening Post, Volume CXXVI, Issue 9, 11 July 1938, Page 13
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.