PRICES OF BASE METALS
("fey Telegraph—Press Assn.—Copyright.)
(Received July 1, .11.30 a.m.)
LONDON, June 30. The official London (middle) quotations, as reported by the Australian Mines and Metals Association, compare with those previously cabled as follows:—
June 29. Per ton. £ s. d. June 30. Per ton. £ s. d, Copper— Standard, spot 36 15 0 Ditto, forward 37 0 7£ Electrolytic . 40 15 0 to 41 15 0 Wire bars .. 41 15 0 Lead— 37 18 9 38 4 At\ 42 0 0 43 0 0 43 0 0 Spot 14 6 10£ Forward ... 14 7 6 Spelter— Spot 13 10 0 Forward ... 13 14 4£ rin— Spot 184 5 0 Forward ... 185 7 6 Silver— > Standard, per oz 19 l-16d Fine 20 9-16d 15 1 3 15 1 3 14 2 6 14 6 10^ 189 7 6 190 2 6 19 l-16d 209-16d
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19380701.2.135.13
Bibliographic details
Evening Post, Volume CXXVI, Issue 1, 1 July 1938, Page 12
Word Count
144PRICES OF BASE METALS Evening Post, Volume CXXVI, Issue 1, 1 July 1938, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.