TALISMAN DUBBO.
Operations at the new mill of the Talisman Dubbo Gold Mine, Karangahake, were commenced on Monday last. The mill will operate on lowgrade ore for a fgw weeks to "run in" the machinery and "cure" the plant. All the machinery is new and of the latest type. It has been designed for efficiency and low running costs. Electricity provides the motive power and the mil] can be operated with a shift of two men. It is designed to treat from 125 to 150 tons a week and a large tonnage of ore has been broken out ready for treatment.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19380530.2.143.12
Bibliographic details
Evening Post, Volume CXXV, Issue 125, 30 May 1938, Page 12
Word Count
101TALISMAN DUBBO. Evening Post, Volume CXXV, Issue 125, 30 May 1938, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.