WHITE'S ELECTRIC DREDGE
The engineer supervising^the reconstruction of the tables for White s Electric Gold Dredging Co. (Barrytown), Ltd., reports,as follows as at September 5:-Pleased to inform you that work of reconstruction of tables is almost complete. ••During the past week nine shifts carried, out intermittent dredging, permitting adjustments to be made. Distribution and general working of the. reconstructed tables, proved very satisfactory, puring the coming week three shifts daily will be worked. The dredge us now being worked at a capacity of 12,000 yards per week, and there is every indication that it; will' be possible m future to work at this rate and at the same time make a-high.percentage of recovery.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19370909.2.113.16
Bibliographic details
Evening Post, Volume CXXIV, Issue 61, 9 September 1937, Page 12
Word Count
113WHITE'S ELECTRIC DREDGE Evening Post, Volume CXXIV, Issue 61, 9 September 1937, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.