Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image
Article image
Article image

MINING NEWS

LATEST RETURNS

(By Telegraph—Press Association.) HOKITIKA, April 27. The Rimu dredge return was 303.20z for 133 hours, in which 47,574 yards were dealt with. MOSSY CREEK. The Mossy Creek Gold Dredging Co., Ltd., reports a return of 17oz Gdwt from 9870 cubic yards in .130 hours. BULOLO DREDGE. Production for the four dredges of the Bulolo Gold Dredging, Ltd., for March, compares with that of February, shown in parentheses, as follows:—Cubic yards, 918,000 (885,000); bullion, 17,80G0z (18,358); gold, 12,384 fine ounces (12,726); Australian currency, £108,360 (£111,352).; per cubic yard, 28.3 (30.2); working profit, £77,542 (£77,657). Gold values are at £8 15s per fine oz, Australian currency. ARAHURA DREDGING. Arahura Gold Dredging, Ltd. (N.Z.). reports that the plans and specifications of the dredge were completed early this year. Satisfactory progress is being made with manufacture of equipment. The dredge will be electrically operated, fitted with 18 cubic feet buckets, capable of digging and treating 400,000 cubic yards monthly,, and the design includes the most modern type of gold-saving plant. It is anticipated that the dredge will be ready to begin operations about themiddle of next year. The directors add that although it is not anticipated that any material depreciation in the price of gold will occur, ample provision has been made. All calculations have been' based on gold valued at £4 16s sterling or £6 New Zealand per oz, which is considered sufficiently conservative to cover any variation in the London price of gold or any variation in the existing exchange rate. GOLD RETURNS. Returns of gold dredging and mining conipanies in.New Zealand as received this week are as follows: — Hours. oz. dwt. Maori Gully 132 27 5 . Mataki 128 ' 30 0 King Solomon (week) 20 14 Worksop ...' ..;.135 2S 0 Argo 113 T4 0 Walpapa Beach 129 22 0 Xemona 129 33 0 Mossy Creek 130 17 96 Mataki Junction SI 53 10 Golden Sands (34 shifts) 42 18 Gillespie's Beach. —Dredge stopped. Blmu Dredge 133 303.2

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19370428.2.147.11

Bibliographic details

Evening Post, Volume CXXIII, Issue 99, 28 April 1937, Page 14

Word Count
329

MINING NEWS Evening Post, Volume CXXIII, Issue 99, 28 April 1937, Page 14

MINING NEWS Evening Post, Volume CXXIII, Issue 99, 28 April 1937, Page 14

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert