BIG RIVER REPORT
, Big River Gold Mines, Ltd., reports for the week ending December 21 as follows: —No. 4 Level. —South stope: Filling-in work was completed and now rising for new stope. No; 5 Level.— South drive advanced 10ft on reef track carrying small seams of stone. North drive was advanced 14ft on reef track carrying small -seams and boulders of stone. Total distance driven, reef track, south drive 42ft; north drive 29ft; total, 71ft. Of this there is 25ft showing in north drive showing 2ft of reef overhead. The north drive has been driven through reef track carrying boulders of stone. The annual inspection of boiler and plant was completed and found in good • order.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19361229.2.111.13
Bibliographic details
Evening Post, Volume CXXII, Issue 155, 29 December 1936, Page 10
Word Count
116BIG RIVER REPORT Evening Post, Volume CXXII, Issue 155, 29 December 1936, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.