CLEANING THE MAINS
WORK AT LOWER HUTT
the work of clearing the water main in Lower Hutt of internal corroby a special process is at present ;in hand. About 5£ miles of mains 'will .be' treated, and so far 2J .. miles have been done, in Bridge Street, Pharazyn Street, Aglionby „, Street, part of Western , Hutt Road, „' Titoki, Buckley, Alice, Valentine, Montague, Tama, . Wakefield, and Mudie *• Streets, and work is at present being carried out in Pretoria Street. • Residents are warned beforehand that the water will be cut off for 241 hours and during that time any person who runs out of water is supplied .• from a water cart. • ■ The process not only cleans the pipes ■■■ but coats the inside with smooth concrete.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19360915.2.121
Bibliographic details
Evening Post, Issue 66, 15 September 1936, Page 11
Word Count
122CLEANING THE MAINS Evening Post, Issue 66, 15 September 1936, Page 11
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.