WORK ON HILL ROAD
With reference to a request by a resident of Hill Road, Belmpnt, that the alignment along a length fronting his property be Improved by filling across instead of following round a bend, the engineer reported to the Hutt Council at its meeting yesterday that it would be possible to do what was desired, but the road was already on a very steep grade, and if it were shortened by going across the bend the grade would necessarily become still steeper. For ,this reason the engineer did not recommend agreeing to the request. The council decided not to agree to the request.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19360718.2.168.4
Bibliographic details
Evening Post, Volume CXXII, Issue 16, 18 July 1936, Page 24
Word Count
105WORK ON HILL ROAD Evening Post, Volume CXXII, Issue 16, 18 July 1936, Page 24
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.