OKARITO RESULTS.
■ The Okarito Five Mile Beach Gold Dredging Company, Ltd., has advised the Stock Exchange Association that production during the four weeks from March 22 to April 18-was as follows:— Total gold won, 50oz .ldwt; total time worked, 508 hours; total non-working time, 68 hours; total' yardage treated, 29,000, at average of 57 cubic yards per hour. . . .
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19360507.2.127.4
Bibliographic details
Evening Post, Volume CXXI, Issue 107, 7 May 1936, Page 12
Word Count
58OKARITO RESULTS. Evening Post, Volume CXXI, Issue 107, 7 May 1936, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.