READY FOR SERVICE. -The WaUma Tunnel, one of the completed works on, the route of the East. Coast.Railway. This is one of. several tunnels which are ready for use when the Mohaka Viaduct and one or two other minor links are completed on\this railway.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19351228.2.36.8
Bibliographic details
Evening Post, Volume CXX, Issue 155, 28 December 1935, Page 9
Word Count
44READY FOR SERVICE.-The WaUma Tunnel, one of the completed works on, the route of the East. Coast.Railway. This is one of. several tunnels which are ready for use when the Mohaka Viaduct and one or two other minor links are completed on\this railway. Evening Post, Volume CXX, Issue 155, 28 December 1935, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.