BRIDGE; A#D ROAD.— The threephotographs \. .here reproduced show the -progress- that has/been made, with. the construction. of the Paremata Bridge and the mile .of road to serve . Plimmerlon and surrounding districts. ■ Above, a view of the construction 'work on the- new bridge,' showing staging piles, being driven into the bed of the channel. Top right, ivorkmen forming a road round Goat Point. The Main Trunk railway line runs around this point and care has to be taken to prevent rocks from falling on the. line. On right, a general view of the formed road, with • the existing . railway bridge and! the new traffic bridge in the middle distance.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19351203.2.47.7
Bibliographic details
Evening Post, Volume CXX, Issue 134, 3 December 1935, Page 9
Word Count
108BRIDGE; A#D ROAD.—The threephotographs \. .here reproduced show the -progress- that has/been made, with. the construction. of the Paremata Bridge and the mile .of road to serve . Plimmerlon and surrounding districts. ■ Above, a view of the construction 'work on the- new bridge,' showing staging piles, being driven into the bed of the channel. Top right, ivorkmen forming a road round Goat Point. The Main Trunk railway line runs around this point and care has to be taken to prevent rocks from falling on the. line. On right, a general view of the formed road, with • the existing . railway bridge and!the new traffic bridge in the middle distance. Evening Post, Volume CXX, Issue 134, 3 December 1935, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.