GOLD DREDGING AND MINING
■■"■"" DUNEDIN, 26th April. Golden Progress Quartzl Mining Company, Ltd., reports plates and boxes partially cleaned for. 106oz of gold and one ton of concentrates obtained from 80 tons of quartz. Stopping- not proceede with. Quartz was crushed on account of development operations. '
The Okarito Five Mile Beach Gold Dredging Co. reports wash-up for week ended Saturday, 440z 9dwt for 129% hours' dredging.
Golden Terrace Extended Gold Dredging Company reports, a wash-up of 660z 6dwt for four days' dredging in solid ground. The wash is improving, and much higher returns a*e anticipated. . Golden Dawn has telegraphed the Wellington Stock 'Exchange"as "follows:—39B ■tons treated, covering 15 working days ending 18th April. Battery' assay value at 92 per cent., extraction £1120; bullion recovered value £840, with further recovery to come. Last consignment bullion realised, £5 13s,per gold ounce.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19320427.2.148.8
Bibliographic details
Evening Post, Volume CXIII, Issue 98, 27 April 1932, Page 12
Word Count
139GOLD DREDGING AND MINING Evening Post, Volume CXIII, Issue 98, 27 April 1932, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.