Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image

STORMWATER DRAINAGE AT ISLAND. BAY.— For many years stormwater problems have troubled Island Bay, and on many occasions flood waters Jmve overtaxed the old system running the length of the Parade. Within 'a few "weeks hose troubles will be at an end, for the new system Juts been designed to take care of a high flood volume of stormwater.. With the completion of this big work and the stormivater provision at Miramar and in Bridge street, Kilbirnie,-Wellington's major, surface drainage works will have been attended to. The remodelling of the sewerage system at Island Bay will receive attention later. No sewage' ivill be allowed into the system, now in hand. On the left is a view of the outlet, and, on the right, the interior of the outlet.

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19310326.2.59.4

Bibliographic details

Evening Post, Volume CXI, Issue 72, 26 March 1931, Page 11

Word Count
128

STORMWATER DRAINAGE AT ISLAND. BAY.—For many years stormwater problems have troubled Island Bay, and on many occasions flood waters Jmve overtaxed the old system running the length of the Parade. Within 'a few "weeks hose troubles will be at an end, for the new system Juts been designed to take care of a high flood volume of stormwater.. With the completion of this big work and the stormivater provision at Miramar and in Bridge street, Kilbirnie,-Wellington's major, surface drainage works will have been attended to. The remodelling of the sewerage system at Island Bay will receive attention later. No sewage' ivill be allowed into the system, now in hand. On the left is a view of the outlet, and, on the right, the interior of the outlet. Evening Post, Volume CXI, Issue 72, 26 March 1931, Page 11

STORMWATER DRAINAGE AT ISLAND. BAY.—For many years stormwater problems have troubled Island Bay, and on many occasions flood waters Jmve overtaxed the old system running the length of the Parade. Within 'a few "weeks hose troubles will be at an end, for the new system Juts been designed to take care of a high flood volume of stormwater.. With the completion of this big work and the stormivater provision at Miramar and in Bridge street, Kilbirnie,-Wellington's major, surface drainage works will have been attended to. The remodelling of the sewerage system at Island Bay will receive attention later. No sewage' ivill be allowed into the system, now in hand. On the left is a view of the outlet, and, on the right, the interior of the outlet. Evening Post, Volume CXI, Issue 72, 26 March 1931, Page 11

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert