EAST COAST RAILWAY
(By Telegraph.—Press Association.) TAUKANGA, This Day. That portion of the East Coast railway from Te Puna to Tahawai, on the Tauranga-Waihi section, constructed by Sir W. G. Armstrong, Whitworth, and Co., will be finally handed over to the Government as from to-morrow. Trains will continue to be run by the Public Works Deparlment until the lino is Inken over by the Working Railways, either on 18th or 30th June.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19280531.2.89
Bibliographic details
Evening Post, Volume CV, Issue 127, 31 May 1928, Page 12
Word Count
72EAST COAST RAILWAY Evening Post, Volume CV, Issue 127, 31 May 1928, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.