CEMENT PRICE ADVANCED
Portland cement has been advanced in price as from Ist August, equivalent to 9s per ton, to 17s 6d per cask or three bags. The rise represents 6d per bag. The advance in price is attributed to a rise of 10s per ton in the price of coal, and the increased coat of freights, wages, and general stores. Bags, for instance, cost double what they did before the war.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19190805.2.100
Bibliographic details
Evening Post, Volume XCVIII, Issue 30, 5 August 1919, Page 8
Word Count
72CEMENT PRICE ADVANCED Evening Post, Volume XCVIII, Issue 30, 5 August 1919, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.