MINING NEWS
WAIHI GRAND JUNCTION. The following cablegram has been 6cnt to the head office, London: — "We are crushing 425 tons per day, the actual extractior 30s per ton. Pumping compartment of No 1 shaft is now down 1264 feet. The flow of water equals 10,000 gallons per hour"
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19150611.2.20
Bibliographic details
Evening Post, Volume LXXXIX, Issue 137, 11 June 1915, Page 3
Word Count
49MINING NEWS Evening Post, Volume LXXXIX, Issue 137, 11 June 1915, Page 3
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.