SUBURBAN RAILWAYS
» ■ .VICTORIA'S ELECTRIFICATION' ! SCHEME. (By Telegraph.— Press Association.— Copyright.) (Received March 24, 10.15 a.m.) MELBOURNE, This Day. The estimated cost to electrify the suburban railways is £3.991,350. It is anticipated that pa.rt of the, Bervicc will bo in operation next year.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19140324.2.88
Bibliographic details
Evening Post, Volume LXXXVII, Issue 70, 24 March 1914, Page 7
Word Count
42SUBURBAN RAILWAYS Evening Post, Volume LXXXVII, Issue 70, 24 March 1914, Page 7
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.