DREDGING RETURNS.
. » [BT TELEGBAPH.— PBESS ASSOCIATION.] DUNEDIN, 31st March. Dredging returns : — Golden Bed, 330z 15d\vt; Rise and Shine 1., 20oz 14dwt ; Golden Treasure, 20oz ; Muddy Terrace Sluicing, 2460z 3dwt 14gr. WORKSOP* DREDGE. The following is tho weekly report of the Worksop dredge : — 74oz 4Pawt ; 120 hours.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19120401.2.125
Bibliographic details
Evening Post, Volume LXXXIII, Issue 78, 1 April 1912, Page 8
Word Count
46DREDGING RETURNS. Evening Post, Volume LXXXIII, Issue 78, 1 April 1912, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.