TAUERU RIVER BRIDGE CLOSED
Dominion Special Service. MASTERTON, April 29. Repair work on the Tatieru River Bridge, on the Maslerfon-Gladstone highway. has necessitated the closing of this bridge to vehicular and slock traffic.' 'l’he Wairarap.'i Soulli Comity Council docs not expect, that the bridge will be closed for any\ undue length of Hine, and the work is to be proceeded with as speedily as possible.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19400430.2.76
Bibliographic details
Dominion, Volume 33, Issue 183, 30 April 1940, Page 8
Word Count
65TAUERU RIVER BRIDGE CLOSED Dominion, Volume 33, Issue 183, 30 April 1940, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.