CENTRAL LIBRARY.-—With the foundations and below-ground work completed, the new Wellington Central Library building is beginning to take shape as the reinforcing iron skeleton is being placed in position.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19380813.2.57.5
Bibliographic details
Dominion, Volume 31, Issue 272, 13 August 1938, Page 9
Word Count
29CENTRAL LIBRARY.-—With the foundations and below-ground work completed, the new Wellington Central Library building is beginning to take shape as the reinforcing iron skeleton is being placed in position. Dominion, Volume 31, Issue 272, 13 August 1938, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.