Late Commercial
GOLD DREDGING RETURNS
By Telegraph—Press Association. Greymouth, February 18. The Maori Gully dredge return is 450 z. sdw,t. retorted gold for 182 hours’ dredging. It is expected that dredging operations will be discontinued for two or three weeks about Thursday next to permit blasting away the position of a high reef blocking the entrance to Waimea Creek.
The Mossy Creek return is 230 z Bdwt. from 6545 yards of material in 137 hours.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19380219.2.117
Bibliographic details
Dominion, Volume 31, Issue 124, 19 February 1938, Page 14
Word Count
75Late Commercial Dominion, Volume 31, Issue 124, 19 February 1938, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.