NEW FIRE-ENGINE
Delivery to Brigade POWERFUL PUMP FITTED The second of the two new fire engines bought by the Wellington Fire Board was put in commission last evening. It will be kept at the Central station. The machine is similar to that delivered a short time ago, the chief differences being some slight bodywork alterations to give better streamlining, and the provision of a 400-gallon per minute pump as against the 250-gallon per minute pump fitted to the sister engine.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19331201.2.52
Bibliographic details
Dominion, Volume 27, Issue 58, 1 December 1933, Page 10
Word Count
80NEW FIRE-ENGINE Dominion, Volume 27, Issue 58, 1 December 1933, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.