View of opened trapdoors of four of tho grcit underground oil reservoirs at No. 2 well. There are In all six underground reservoirs at this well, five of which are absolutely full of crude, petroleum, storing 188,000 gallons. The tanks at the running wells possess an aggregate capacity of over 451,000 gallons. The last one now being excavated at No. 5 will probably have a holding capacity of 70,000 gallons. \ W. A. Collis Photo, N.P,
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19120330.2.103.4
Bibliographic details
Dominion, Volume 5, Issue 1402, 30 March 1912, Page 18
Word Count
75View of opened trapdoors of four of tho grcit underground oil reservoirs at No. 2 well. There are In all six underground reservoirs at this well, five of which are absolutely full of crude, petroleum, storing 188,000 gallons. The tanks at the running wells possess an aggregate capacity of over 451,000 gallons. The last one now being excavated at No. 5 will probably have a holding capacity of 70,000 gallons. \ W. A. Collis Photo, N.P, Dominion, Volume 5, Issue 1402, 30 March 1912, Page 18
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.