WATER SUPPLY.
THE WALNUT PIPE LINE. Surveys for the new two million gallon storage reservoir lo be constructed between Nairn Street and Brooklyn in connection with the scheme of duplication of the YVainui main have been completed. Plans arc now being prepared for the work. Arrangements are being made for suitable depots along the route of the Wainui pipe line for the storage of pipes. A shipment of pipes for the duplication works is due to arrive In-day by the lonic. It is anticipated that a start will be made with the work of doubling the pipe line about the middle of next month. ~~
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19110516.2.108
Bibliographic details
Dominion, Volume 4, Issue 1128, 16 May 1911, Page 8
Word Count
104WATER SUPPLY. Dominion, Volume 4, Issue 1128, 16 May 1911, Page 8
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.