PORT OF BUENOS AYRES.
BIG IMPROVEMENT SCHEME. • By relecra-Dh—Press Association—Copyright (Rcc. May 1, 10.45 p.m.) ' Buenos Ayres, May I. ! The Government has accepted the ten- i dor of the C. H. Walker Company, a British concern, for tho construction of' tho new harbour for .£5,500,000, The rapid growth of tho trade and population of 13uenos Ayres has made it imperative to provide additional dock fa- 1 cilities. The existing accommodation ' comprise four wet docks and north and south basins, to which cntrauco channels have been dredged. The quays are 1 to have a total length of 3270 yards and the depth of water in tho docks is about 23ft. !)in. at low water. It is now I proposed to construct a scries of tidal basins at the north end of the present docks, rlie water area of tho present docks is 174 acres, and the new basins will add something like 200 acres. Provision is to be made in tho basins for a depth of 30ft. at low water, and the entrance channels aro to be deepened
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/DOM19110502.2.63
Bibliographic details
Dominion, Volume 4, Issue 1116, 2 May 1911, Page 5
Word Count
177PORT OF BUENOS AYRES. Dominion, Volume 4, Issue 1116, 2 May 1911, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.