Public Notices LYTTELTON HARBOUR BOARD CONTAINER TERMINAL Containers Unpacked AOTEA VOY. 7385 , MOLU 2372419 TOLAGA BAY VOY 6418/6524 KNLU 2064279 HLCU 2276252 NZSU 7620049 OCLU 2516622 OCLU 2610095 Storage charges commence October 3, 1986. All FCLs from the Tolaga Bay Voy. 6418/6524 and the Australian trader Voy. 17 except those stopped for an AG permit are now available, storage charges commence October 3, 1986. EAST WARD RESIDENTS HEAR YOUR CANDIDATES FOR THE CHRISTCHURCH CITY COUNCIL MT PLEASANT COMMUNITY CENTRE 7.30 P.M. TONIGHT
Public Notices APPLICATION FOR GUIDING AND RAFTING CONCESSION WESTLAND NATIONAL PARK TAKE notice that Trinity Tours, Ltd of P.O. Box 25, Franz Josef Glacier has applied for a licence to provide the following services in Westland National Park. 1. Guided canoe expeditions on waters within Westland National Park excepting Lake Matheson. 2. White water rafting on the Upper Waiho and Okarlto Rivers. Submissions concerning this application should be in writing to reach the Commissioner of Crown Lands, P.O. Box 123, Hokitika, by October 28, 1986. Further Information may be obtained from the applicants or from the aforesaid Commissioner. TRINITY TOURS, LTD WEATHER permitting, electricity supply will be off in the MARSHLAND AREA on TUESDAY, SEPTEMBER 30 as follows, to allow work to be done on 11,000 volt lines. 9 a.m. to 11.30 a.m. McSaveneys Rd, and the adjacent section of Marshland Road. Supply may be restored at any time prior to the advertised time. C. S. LAURIE, General Manager MUNICIPAL ELECTRICITY DEPARTMENT QUANTITY SURVEYOR MR P. W. FOSTER, technical member of the N.Z. Institute of Quantity Surveyors is available for further engagements to carry out tenders, budgets, quantities, rates, estimating, variations, progress claims and final accounts. Please reply to P.O. Box 26004, Chch, or phone 61-808 (collect if necessary).
COURT Live theatre at its best Phone 66-992 after 10 a.m. Elizabeth Moody, Jonathan Elsom, Stuart Devenie in A oumptuou* row production of Oscar Wilds's THE IHFOKTfINQE OF £EINQ EARNEST The wittiest play in the world! “Gaiety in abundance... Sustained wit" The Star Concessions after 7.30 THE PRESS CLASSIFIEDS Phone 792-440
f EVERYBODY HAS AN AURA A FASCINATING EVENING ON SPIRITUAL GUIDES ESP, LIFE PURPOSE. ACHIEVING INNER HEALTH. FREE LECTURE AT 7.30 P.M. WEDNESDAY, OCTOBER 1, CANTERBURY INN THURSDAY, OCTOBER 2, RICCARTON HOUSE KAHU ROAD PHONE 810-017 INNER PEACE MOVEMENT.
PORT HILLS ENERGY AUTHORITY P.O. BOX 4, LYTTELTON OPERATIVE DATE OF TARIFF OCTOBER 1, 1986 Meters are read: 2 monthly. PENALTY: All rates are subject to an “on-charge” of an additional 10 per cent, which amount will be charged if the account is not paid by the due date shown on the account, i.e.: within 14 days of rendering. The tariff is subject to the Councils’ Terms and Conditions of Supply. DOMESTIC CONSUMERS Indus. Code Nett GST of GST Supply Charge Standard and 10.00 1.0 11.0 Economy 8 cents per day 24 HOUR AVAILABILITY OF SUPPLY DMI Standard (includes All units 4.850 0.485 5.335 Controlled water cents each heating) DM3 Standard (when All units 5.136 0.514 5.650 water heating is cents each on night only) DMIA Economy 8 7 a.m.-ll p.m. All units 5.136 0.514 5.650 11 p.m.-7 a.m. All units 2.950 0.295 3.245 cents each LESS THAN 24 HOUR AVAILABILITY DM2 Storage space heating 11 p.m.-7 a.m. and All units 3.350 0.335 3.685 I p.m.-4 p.m. cents each DM4 Storage space heating only All units 2.950 0.295 3.245 II p.m.-7 a.m. only cents each DMS Storage space heat- All units 3.150 0.315 3.465 ing on DM2 and DM4 cents each NON-DOMESTIC CONSUMERS Supply Charges NDI only 10.0 1.0 11.0 NDI with ND2 or ND3 all 13.0 1.3 14.3 NDIA cents 13.0 1.3 14.3 ND4 or NDS per 23.0 2.3 25.3 ND4A or NDSA day 30.0 3.0 33.0 jsJD6 500.0 50.0 550.0 24 HOURS AVAILABILITY OF SUPPLY NDI Standard All units 12.75 1.275 13.025 cents each NDIA Day/Night 7 a.m.-ll p.m. All units 13.794 1.379 15.173 11 p.m.-7 a.m. All units 3.350 0.335 3.685 ' cents each ND4 MAXIMUM DEMAND, Standard Large User (minimum chargeable All units demand 50 kVA/month) cents each 5.565 0.557 6.122 Summer Demand 15 Sept—ls May, per kVA $ 7.09 80.71 $7.80 Winter Demand 15 May—ls Sept, per kVA $24.47 $2.45 $26.92 ND4A MAXIMUM DEMAND, Day/Night Large User (minimum chargeable) demand 50 kVA/mth) 7 a.m.-ll p.m. All units 5.811 0.581 6.392 11 p.m.-7 a.m. All units 3.350 0.335 3.685 Summer Demand 15 Sept—ls May, per kVA $ 7.09 $0.71 Winter Demand 15 May—ls Sept, per kVA $24.47 $2.45 $26.92 NDS MAXIMUM DEMAND, Standard, Bulk Supply (minimum chargeable All units demand 200 kVA/mth) cents each 3.370 0.337 3.707 Summer Demand 15 Sept—ls May, per kVA $ 6.19 $0.62 56.81 Winter Demand 15 May—ls Sept, per kVA $21.35 $2.14 $23.49 NDSA MAXIMUM DEMAND, Day/Night, Bulk Supply (minimum chargeable demand 200 kVA/mth) 7 a.m.-ll p.m. All units 3.417 0.342 3.759 11 p.m.-7 a.m. All units 2.946 0.295 3.241 cents each Summer Demand 15 Sept—ls May, per kVA S 6.19 Winter Demand 15 May-15 Sept, per kVA $21.35 $2.14 $23.49 ND6 COINCIDENT DEMAND—Major Industrial Supply (a) SUPPLY CHARGE $5 per day for each separate point of metering, nett, (GST, $0.50 per day), $5.50 per day inclusive of GST. (b) WINTER DEMAND CHARGE (Coincident). $69.16 per kVA of the average of the six loads of the consumer coinciding with the six Winter Demand periods of the Authority, as charged by M.0.E., nett. These will occur only between 15 May and 15 September and between the hours of 7 a.m. to 11 p.m. (GST, $6.02 per kVA), $76.08 per kVA inclusive of GST. (c) ANYTIME DEMAND CHARGE (Coincident). $20.05 per kVA of the average of six loads of the consumer coinciding with the six Anytime Demand periods of the Authority, as charged by M.0.E., nett. (GST, $2 per kVA), $22.05 per kVA inclusive of GST. (d) CONSUMER DEMAND CHARGE $31.24 per kVA of annual maximum demand, nett. (GST, $3.12 per kVA), $34.36 per kVA inclusive of GST. (e) DAY ENERGY CHARGE 3.910 cents per unit of electricity supplied between the hours of 7 a.m. and 11 p.m., net (GST, 0.391 cents per unit), 4.301 cents per unit inclusive of GST. , . . .. (f) NIGHT ENERGY CHARGE 2.935 cents per unit of electricity supplied between the hours of 11 p.m. and 7 a.m., nett (GST, 0.294 cents per unit), 3.229 cents per unit inclusive of GST. (g) REDUCTION FOR 11,000 VOLT CONSUMERS (1) For consumers who provide their own transformer/s, the consumer demand charged is reduced by 10 per cent. (2) The tariff will be subject to an over-all discount of 1 p.c. NDB COMMUNITY RELATED All units 6.000 0.600 6.600 LESS THAN 24 HOUR AVAILABILITY ND2 Controlled heating or refrigeration All units 4.850 0.485 5.335 ND3 Storage space or water heating _ _ 11 p.m.-7 a.m. only All units 3.350 0.335 3.685 BUILDERS TEMPORARY SUPPLY House building and similar large building, Fixed Charge on application $50.00, GST $5.00, $55.00. PUBLIC LIGHTING Rates on application to Authority SPECIAL FEES Caravan electrical Warrant of Fitness (valid 40 months), $9.50, GST $0.95, $10.45. Disconnection, reconnection or special reading, $14.50, GST $1.45, $15.95. Reconnection (after normal working hours), $50.00, GST $5.00, $55.00. Deposit (meter re-test), $30.00, GST $3.00, $33.00. Reinspection of wiring, $30.00, GST $3.00, $33.00. Public telephone box supply (per annum), $50.00, GST $5.00, $55.00. D<Jposit, before connection—rented domestic properties, $75.00, GST $7.50, $82.50; —all non-domestic consumers Average 2 months consumption.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19860930.2.123.1
Bibliographic details
Press, 30 September 1986, Page 31
Word Count
1,219Page 31 Advertisements Column 1 Press, 30 September 1986, Page 31
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.