Haast bridge
The Gates of Haast bridge 9.4 km on the West Coast side of the Haast Pass, will be closed at night between December 12 and 24 to enable strengthening work to be done.
The bridge will be closed between 4 p.m. and 10 a.m. while the Ministry of Works and Development repairs damage caused by floods three years ago. A new span will be added at the Haast end of the bridge and new concrete cylinders installed to support the new span and the existing truss.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19821119.2.20.3
Bibliographic details
Press, 19 November 1982, Page 2
Word Count
88Haast bridge Press, 19 November 1982, Page 2
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.