A building permit is required for any structural alteration with the only exception being maintenance.
The permit should be taken out by the builder unless there is a binding legal contract. The onus rests on the person who takes out the permit to meet all the local authority's standards.
It is the job of the local authority, once a building permit has been taken out, to ensure that subsequent building meets all safety
and structural requirements.
Building inspectors can also offer advise to homeowners but cannot undertake planning. The cost of the permit varies with the cost of the job. A building permit issued by the Christchurch City Council for a $35,000 house would cost $168; a $311,000 flat, $153: and a $50,000 house. $213. For this fee the building inspector would make between five and six visits to inspect the work.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19811020.2.103.8
Bibliographic details
Press, 20 October 1981, Page 23
Word Count
142Untitled Press, 20 October 1981, Page 23
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.