Progress on well
PA Wellington Results from the Mikonui well being drilled about 64 km off Greymouth are likely by late this month. ' The local representative of Diamond Shamrock. Mr F. Goerner, said yesterday that drilling by the Sedco 445 rig had reached 335 m.
He expected the well would reach its 2100 target depth within a fortnight.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19810806.2.35
Bibliographic details
Press, 6 August 1981, Page 3
Word Count
58Progress on well Press, 6 August 1981, Page 3
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.