Clutha contract let
t . A Wellington A conuaci worth $1.2 million has been let to Wilkins and Davies Construction, Ltd, for the second stage of the Clyde Dam left bank excavation. . The member of Parliament .for Otago (Mr W. E. Cooper) said the contract
was for a period of nine months and covered the construction of roads and cableway benches, the installation' of culverts and the excavation of more than 400,000 cubic metres of rock.'
“The work at Clyde Dam is advancing well to meet the . mid-1982 river diversion date,” he said/’
“The total spent on the Clutha Valley development is now $75 million, of which $47 million has been spent on construction work • and the remainder, on servicing charges, such as land purchase . and compensation, plant purchases and irrigation, investigation.” .
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19810515.2.71
Bibliographic details
Press, 15 May 1981, Page 12
Word Count
131Clutha contract let Press, 15 May 1981, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.