Ore contracts extended
Hamersley Holdings, Ltd, and the Japanese, steel industry signed agreements in Tokyo extending two long term iron ore contracts by two years until March, 1982. The two sides reached basic agreement last March on the extension, which covers annual shipments of 4.1 million tonnes under the Nd. 2 contract and 1.5 million tonnes under the No. 3 contract.
The two agreements account for a quarter of the 23 million tonnes a year covered by Hamersley’s four long term contracts with the Japanese. ______________
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19800805.2.123.17
Bibliographic details
Press, 5 August 1980, Page 21
Word Count
85Ore contracts extended Press, 5 August 1980, Page 21
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Copyright in all Footrot Flats cartoons is owned by Diogenes Designs Ltd. The National Library has been granted permission to digitise these cartoons and make them available online as part of this digitised version of the Press. You can search, browse, and print Footrot Flats cartoons for research and personal study only. Permission must be obtained from Diogenes Designs Ltd for any other use.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.